MANUFACTURING

Protect connected production from wireless uncertainty.

Trace wireless risk across machinery, mobility, automation and the network services that production depends on.

OPERATIONAL SIGNAL / 04
Evidence
Correlated
Risk
Prioritized
Action
Independent

THE DECISION BEFORE THE EQUIPMENT

Steel, moving equipment, changing cells and mixed client capabilities can expose design assumptions. We connect technical evidence to the production workflow and its operational criticality.

FIVE DIAGNOSTIC LAYERS

Not just an RF survey.

A survey describes radio conditions. The assessment evaluates why the business may be experiencing a problem, while clearly separating confirmed findings, contributing factors and items requiring further observation.

01

RF environment

Coverage, SNR, spectrum, interference, utilization and capacity.

02

Wireless architecture

AP placement, channels, power, roaming, WLAN and redundancy.

03

Client experience

Capabilities, connection behavior, firmware and application requirements.

04

Access & network

Authentication, NAC, VLANs, DHCP, DNS, switching, PoE, uplinks and QoS.

05

Operations

The workflow, location, timing, load, change and business criticality.

KEEP • FIX • MOVE • ADD • REPLACE

Turn evidence into an infrastructure decision.

KEEPMeets the requirement
FIXCorrectable condition
MOVEIncorrectly positioned
ADDMissing capacity or resiliency
REPLACECannot meet the requirement

THE DELIVERABLE

A risk report built for technical and executive decisions.

  • Executive risk summary
  • Root-cause and contributing-factor findings
  • Risk map and prioritized remediation plan
  • Investment guidance and recommended next actions
Sample assessmentIllustrative data—not customer results

WIRELESS OPERATIONAL RISK REPORT

Sample Distribution Center

72Overall readiness / 100
3Critical risks

RF design78

Roaming61

Infrastructure83

Access control72

Client readiness54

KEEP 67%FIX 12%MOVE 8%ADD 7%REPLACE 6%

QUALIFIED SCOPE

Single-site enterprise assessments typically start at $7,500.

Final scope depends on facility size, complexity, infrastructure, operating requirements and assessment objectives.

Request an assessment